The works currently under way at the Pine Grove/GWR junction are to re-mediate a long standing problem with both foul and rainwater pipes, This will hopefully resolve the poor road surface adjacent as this was undermining the sub base beneath the road surface causing the carriageway to break up.

Title: GWR maintenance
Post by: larrylamb on November 02, 2017, 09:27:27 am
The whole road is due to be swept today and gullies emptied and cleaned.

If your vehicle is parked on the carriageway and you are able to move it please do.

Thankyou