Author Topic: GWR maintenance  (Read 224 times)

0 Members and 1 Guest are viewing this topic.

Offline larrylamb

  • Opinions on many things
  • ***
  • Posts: 439
  • Thanked: 16 times
  • Forum Member
GWR maintenance
« on: October 10, 2017, 10:23:11 am »
The works currently under way at the Pine Grove/GWR junction are to re-mediate a long standing problem with both foul and rainwater pipes, This will hopefully resolve the poor road surface adjacent as this was undermining the sub base beneath the road surface causing the carriageway to break up.

 

Tags: